muse

SUMMER + SEPT // Monthly Progress

Sometimes when you spread yourself too thin, things get attention much less frequently. That isn’t to say I have forgotten my pet project. Here I am, renewed and refreshed with a new test and taking a small break from the site series. It seemed like an easy series to keep up, given that I was matching the pace of the build — it is now complete. So I have some catching up to do.

Apart from hustling and bustling between work, side work, side projects, hobby projects and my pet project, I think what’s been a difficult hill to climb is to break out of the comfort zone of illustrative sketches and reach out to learn the tech side of my project. I still have an invested interest in the idea and the technology, but my skill sets lie elsewhere. Suffice to say, I am no tech wiz and I don’t know the slightest about producing an AR app. I suppose my starting an illustrative test series was my way to get started, but now that I’ve reached double digits, it should be about time to step into the cold water.

Quick read today:

This New AR App is Like Minecraft for Drone Pilots
It’s neat that apps like this are cropping up. I imagine the detail callouts for buildings could be viewed similarly, whether from ground level or up above. In either case it involves the mirage of merging the built environment with the virtual environment.

“But the app isn’t just all fun and games. DroneBase believes that AirCraft can be helpful in visualizing construction projects, particularly when using the blocks with building material textures.”

Tommy Palladino, This New AR App is Like Minecraft for Drone Pilots

Expect some more test sketches soon. 🙂

Standard
test

a test 013

a test 013 –
1 UNIT: Jewel in landscape
OCCUPANCY: Recluse
TYPE(s): architecture, new building
AR/TIFACT(s): 04

A break from the site series because the motivation for upkeep was not present. Refreshing the feel for tests with unusual shapes and complicated details for which AR/tifacts can be extracted.

Standard
test

site series // a test 008

20180901_unitsketch_05_edit

a test 008 –
1 UNIT: space under construction
OCCUPANCY: n/a
TYPE(s): architecture, new building
AR/TIFACT(s): 03

A new vehicle has entered the scene. It was at work in the background before while the CAT was busy clearing and moving dirt. Concrete’s almost complete. The calm before the storm that is Steel to arrive on site.

 

Standard
test

site series // a test 007

20180901_unitsketch_05_edit

a test 007 –
1 UNIT: space under construction
OCCUPANCY: n/a
TYPE(s): architecture, new building
AR/TIFACT(s): 02

The Cat’s still around busy backfilling the foundation. Slab on grade is in place. Suspended slab formwork is in progress, and the main level peri system formwork boards are getting craned in.

Sitework is progressing way ahead of my tests, but we’re making headway finally! I went to a mini lecture recently where Bjarke Ingels came to Toronto to talk about the new development going up on King West. There is a plan in place to interject my site series with a test from there. Not sure how the numbering will solve itself yet.

Did you see the new ipad pro? The forever question of do I need it vs do I want it.

Standard